DUCON (60mm) has been applied as slab-strengthening of the existing platform deck of the Central station in Frankfurt/Main. The existing screed has been replaced by DUCON, which avoided an increase of the dead load and a change of the door heights. In addition the new granite stone cover could be placed 2 days after the concrete infiltration.