New forklift loads required a 50 mm thin slab reinforcement made of DUCON. The 1,500 m² surface was executed without joints, bridges expansion joints and supports the complete acting loads.
Thanks to the reinforcement as a top concrete layer, the conventional demolition and new construction of the floor slabs could be saved. In addition, production downtimes have been reduced to a minimum.